Product Engineering

Suitcase Product Design for Manufacture

A suitcase is easy to draw. It is harder to get a Chinese factory to make the same one. We designed the product and handled the contractors.

Suitcase product design by 3AXIS for manufacture, showing shell, lid and handle in three finishes

Client

Under NDA

Disciplines

Product design, DFM, manufacturing liaison

Product

Suitcase line

Production

Chinese contractors

The brief

A suitcase line that had to be manufactured, not just presented. Shell, lid, and handle, in more than one finish, with the tolerances a factory will actually hold.

The other half of the brief was the contractors in China: someone had to take the model, sit with the shop, and come back with a product that matches the drawing.

The challenge

A pretty render is not a brief a factory can quote. A factory quote is not a product until someone has closed the gap between the two.

  • A shell and lid that close, stack, and tool without a surprise radius
  • A telescopic handle that belongs to the body, not a bought-in part glued on later
  • Colour and finish variants that do not each need a new tool
  • Contractors who will change a wall or a rib unless someone is on the call with the CAD open

How we approached it

The product was designed as a manufacturing set: outer shell, inner volume, lid, and handle, with the joints named. Variants share the same tool path. Colour is a finish, not a new body.

Then the contractors. We handled the Chinese shops: drawings, questions, samples, and the changes that come back from the floor. The model moved when the factory was right. It did not move because someone preferred a prettier still.

What we built

A suitcase line ready for manufacture, and the contractor path that goes with it. The photograph is three finishes of the same design: closed, open, and on its side, so the lid and the handle are both visible.

The client is under NDA. We do not publish the factory names, the order quantity, or a unit cost.

Results

The engagement is under NDA. We do not publish who it was built for, volumes, or a landed cost.

DFM
Designed for the factory
China
Contractors handled
Line
Shell, lid, handle

In use

A later colour or a later run uses the same tools. The contractor conversation stays attached to the files, so the next PO is not a new design argument.

This engagement is covered by a confidentiality agreement, so the client is not named and some implementation detail is described in general terms.